{"id":1338,"date":"2026-09-15T07:00:00","date_gmt":"2026-09-15T06:00:00","guid":{"rendered":"https:\/\/urumetals.com\/?p=1338"},"modified":"2026-09-15T08:37:28","modified_gmt":"2026-09-15T07:37:28","slug":"zeb-nickel-project-drilling-contractor-selection-advanced","status":"publish","type":"post","link":"https:\/\/urumetals.com\/index.php\/2026\/09\/15\/zeb-nickel-project-drilling-contractor-selection-advanced\/","title":{"rendered":"Zeb Nickel Project Drilling Contractor Selection Advanced"},"content":{"rendered":"\n<p class=\"has-text-align-center\">15 September 2026<\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>URU Metals Limited<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>(\u201cURU\u201d or the \u201cCompany\u201d)<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>Zeb Nickel Project Drilling Contractor Selection Advanced<\/strong><\/p>\n\n\n\n<p>URU Metals Limited (\u201cURU\u201d or the \u201cCompany\u201d) is pleased to provide an update on preparations for the next drilling programme at the Zeb Nickel Project in Limpopo, South Africa.<\/p>\n\n\n\n<p>Following completion of the 3D Leapfrog geological model and drill planning, the Company has advanced the drilling contractor selection process and is now completing the final commercial stage ahead of appointment.<\/p>\n\n\n\n<p>Final proposals have been requested from qualified diamond drilling contractors, with the preferred contractor to be selected following review of commercial terms, rig availability, mobilisation timing, technical capability and health and safety performance.<\/p>\n\n\n\n<p><strong>Highlights<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Drilling contractor selection has advanced to the final commercial evaluation stage.<\/li>\n\n\n\n<li>The drilling programme has been designed directly from the completed Leapfrog model.<\/li>\n\n\n\n<li>Initial drilling will focus on the higher-grade Zone 2 mineralisation, with the objective of building towards a maiden mineral resource estimate.<\/li>\n\n\n\n<li>Ground FDEM Target 1 will also be tested early in the programme as a priority target for semi-massive to massive Ni-Cu-PGE sulphides.<\/li>\n\n\n\n<li>Contractor evaluation is focused on technical capability, health and safety performance, commercial terms, rig availability and mobilisation timing.<\/li>\n\n\n\n<li>The Company intends to move to mobilisation as soon as practical following contractor appointment.<\/li>\n<\/ul>\n\n\n\n<p><strong>Drilling Programme<\/strong><\/p>\n\n\n\n<p>The planned drilling programme follows directly from the recently completed Leapfrog modelling, which provided the geological framework required to rank and position the next drill holes.<\/p>\n\n\n\n<p>The first phase will focus on the better-defined higher-grade Zone 2 mineralisation in the southeastern part of the Project, with the objective of improving geological confidence and building sufficient drilling density to support a maiden mineral resource estimate.<\/p>\n\n\n\n<p>Drilling will then progressively test continuity and extensions of Zone 2 into less-defined areas of the Project.<\/p>\n\n\n\n<p>Ground FDEM Target 1 remains an important exploration target and is expected to be tested early in the programme. Target 1 comprises a discrete EM conductor associated with a coincident gravity anomaly within the interpreted intrusive plumbing system and will be tested for a possible concentration of semi-massive to massive Ni-Cu-PGE sulphides.<\/p>\n\n\n\n<p>The programme will be phased and prioritised so that drilling with the greatest potential to advance the Project is undertaken first.<\/p>\n\n\n\n<p><strong>Contractor Appointment<\/strong><\/p>\n\n\n\n<p>The Company is now completing the final commercial stage of the contractor selection process.<\/p>\n\n\n\n<p>The Company expects the next operational update to confirm the appointment of the drilling contractor and the anticipated commencement date for drilling.<\/p>\n\n\n\n<p>Richard Montjoie, Exploration Manager at URU Metals, commented:<\/p>\n\n\n\n<p><em>\u201cWe have now converted the drill plan into a contractor-ready programme, and are in the final commercial stage of selecting the drilling team, with particular focus on capability, rig availability and mobilisation. We are excited to mobilise to site and start turning the geological model into new data.\u201d<\/em><\/p>\n\n\n\n<p><strong>About the Company<\/strong><\/p>\n\n\n\n<p>URU Metals is a mineral exploration and development company focused on advancing high-potential critical metals projects in South Africa. The Company is committed to creating sustainable value through responsible mining practices, regulatory compliance, and active stakeholder engagement. For more information, visit www.urumetals.com<\/p>\n\n\n\n<p>E<strong>NDS<\/strong><\/p>\n\n\n\n<p><strong>For further information, please contact:<\/strong><\/p>\n\n\n\n<p><strong>URU Metals Limited<br><\/strong>John Zorbas<br>Chief Executive Officer<br>+1 416 504 3978<\/p>\n\n\n\n<p><strong>SP Angel Corporate Finance LLP<br><\/strong>Nominated Adviser and Broker<br>Ewan Leggat \/ Caroline Rowe<br>+44 (0) 203 470 0470<\/p>\n\n\n\n<p><strong>Axis Capital Markets Limited<br><\/strong>Joint Broker<br>Richard Hutchison<br>+44 (0) 203 026 0320<\/p>\n\n\n\n<p><strong>Market Abuse Regulation (MAR) Disclosure<\/strong><\/p>\n\n\n\n<p>This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596\/2014 as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018 (\u201cUK MAR\u201d). Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>15 September 2026 URU Metals Limited (\u201cURU\u201d or the \u201cCompany\u201d) Zeb Nickel Project Drilling Contractor Selection Advanced URU Metals Limited (\u201cURU\u201d or the \u201cCompany\u201d) is pleased to provide an update on preparations for the next drilling programme at the Zeb Nickel Project in Limpopo, South Africa. Following completion of the 3D Leapfrog geological model and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1338","post","type-post","status-publish","format-standard","hentry","category-regulatory-news"],"_links":{"self":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts\/1338","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/comments?post=1338"}],"version-history":[{"count":2,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts\/1338\/revisions"}],"predecessor-version":[{"id":1340,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts\/1338\/revisions\/1340"}],"wp:attachment":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/media?parent=1338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/categories?post=1338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/tags?post=1338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}