{"id":1140,"date":"2025-07-31T16:12:44","date_gmt":"2025-07-31T15:12:44","guid":{"rendered":"https:\/\/urumetals.com\/?p=1140"},"modified":"2025-07-31T16:12:44","modified_gmt":"2025-07-31T15:12:44","slug":"zeb-nickel-project-completes-spectremplus-survey","status":"publish","type":"post","link":"https:\/\/urumetals.com\/index.php\/2025\/07\/31\/zeb-nickel-project-completes-spectremplus-survey\/","title":{"rendered":"Zeb Nickel Project completes SpectremPlus Survey"},"content":{"rendered":"\n<p class=\"has-text-align-center\">31 July 2025<\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>URU Metals Limited<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong><br><\/strong>(&#8220;URU&#8221; or the &#8220;Company&#8221;)<\/p>\n\n\n\n<p><strong>Zeb Nickel Project successfully completes<\/strong>&nbsp;<strong>SpectremPlus\u2122 AEM Survey<\/strong><\/p>\n\n\n\n<p>URU Metals Limited (&#8220;URU&#8221; or the &#8220;Company&#8221;) is pleased to confirm that the high\u2011powered SpectremPlus\u2122 airborne electromagnetic (&#8220;AEM&#8221;) survey over its Zeb Nickel Project in Limpopo Province, South Africa (&#8220;Project&#8221;), has been successfully completed on schedule.<\/p>\n\n\n\n<p><strong>Highlights<\/strong><\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;Survey completed safely and on budget.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;~736\u202fline\u2011kilometres flown at 150\u202fm traverse spacing using Spectrem&#8217;s converted DC\u20113 turboprop platform equipped with the proprietary SpectremPlus\u2122 system, capable of imaging conductive bodies to depths in excess of 700\u202fm.\u202f<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;Final, fully processed datasets, 3\u2011D inversion models and an integrated geophysical interpretation are expected by the end of August\u202f2025.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;Deliverables will be integrated with existing gravity\u2011magnetic data to refine and prioritise drill targets focused on potential high\u2011grade nickel\u2011sulphide mineralisation.<\/p>\n\n\n\n<p><strong>Next Steps<\/strong><\/p>\n\n\n\n<p>The Spectrem Air team has begun final processing, following which the Company&#8217;s geophysical consultant will complete a full interpretation and integration with the recently acquired gravity and magnetic datasets. Geofocus has been tasked with the integration of the geological, gravity, magnetic, and EM datasets into a unified 3D geophysical block model.&nbsp;Management anticipates releasing the results, together with an updated technical programme and drill\u2011target inventory, shortly after receipt of the final deliverables, which are expected near the end of Q3 2025.<\/p>\n\n\n\n<p><strong>John Zorbas, CEO<\/strong>, commented:<\/p>\n\n\n\n<p>&#8220;<em>Completion of this state\u2011of\u2011the\u2011art AEM survey marks another key milestone for the Zeb&nbsp;Project. The high\u2011resolution data will underpin our next phase of exploration as we advance toward testing high\u2011grade nickel sulphide targets, which, if successful, will significantly move the needle on the Project.&#8221;<\/em><\/p>\n\n\n\n<p><strong>About the Company<\/strong><\/p>\n\n\n\n<p>URU Metals is a mineral exploration and development company focused on advancing its high-potential critical metals projects in South Africa. The Company is committed to creating sustainable value through responsible mining practices, regulatory compliance, and engagement with stakeholders. For more information, visit&nbsp;<a href=\"http:\/\/www.urumetals.com\/\">www.urumetals.com<\/a>.<\/p>\n\n\n\n<p>For further information, please contact:<\/p>\n\n\n\n<p><strong>URU Metals Limited<\/strong><\/p>\n\n\n\n<p>John Zorbas<\/p>\n\n\n\n<p>(Chief Executive Officer)<\/p>\n\n\n\n<p>+1 416 504 3978<\/p>\n\n\n\n<p><strong>SP Angel Corporate Finance LLP<\/strong><\/p>\n\n\n\n<p>(Nominated Adviser and Broker)<\/p>\n\n\n\n<p>Ewan Leggat \/ Jen Clarke&nbsp;&nbsp;&nbsp;&nbsp; + 44 (0) 203 470 0470<\/p>\n","protected":false},"excerpt":{"rendered":"<p>31 July 2025 URU Metals Limited (&#8220;URU&#8221; or the &#8220;Company&#8221;) Zeb Nickel Project successfully completes&nbsp;SpectremPlus\u2122 AEM Survey URU Metals Limited (&#8220;URU&#8221; or the &#8220;Company&#8221;) is pleased to confirm that the high\u2011powered SpectremPlus\u2122 airborne electromagnetic (&#8220;AEM&#8221;) survey over its Zeb Nickel Project in Limpopo Province, South Africa (&#8220;Project&#8221;), has been successfully completed on schedule. Highlights \u00b7&nbsp;&nbsp;&nbsp;&nbsp;Survey [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1140","post","type-post","status-publish","format-standard","hentry","category-regulatory-news"],"_links":{"self":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts\/1140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/comments?post=1140"}],"version-history":[{"count":1,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts\/1140\/revisions"}],"predecessor-version":[{"id":1141,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/posts\/1140\/revisions\/1141"}],"wp:attachment":[{"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/media?parent=1140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/categories?post=1140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/urumetals.com\/index.php\/wp-json\/wp\/v2\/tags?post=1140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}